免费能直接看黄的视频-成全影视免费观看大全二-久久99精品久久久大学生-亚洲熟妇无码久久精品

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機的生產與制造

24小時全國服務熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://m.huataifoods.com

當前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

主站蜘蛛池模板: 成 人 色综合 综合网站| 亚洲精品国产精品乱码视色| 熟熟熟熟熟熟熟熟妇50岁| 精品久久综合1区2区3区激情| 欧美成人精品三级在线观看| 欧洲美熟女乱又伦免费视频| 妖精色av无码国产在线看| 中国gay片男同志免费网站| 九九久久精品无码专区| 亚洲的天堂av无码| 人c交zoozooxx全过程| 侵犯人妻教师波多野吉衣| 国产帅男男gay网站视频| 夜鲁夜鲁夜鲁视频在线观看| 欧美 丝袜 自拍 制服 另类| 日本按摩高潮a级中文片| 久久精品国产只有精品66| 在线不卡√二区| 国产毛片久久久久久国产毛片| 欧美黑人xxxx高潮猛交| 成人黄色网址| 国产香港明星裸体xxxx视频| 麻花豆传媒剧国产mv网站入口| 无码久久精品国产亚洲av影片| 国产婷婷色综合av蜜臀av| 免费特级毛片| 成人免费一区二区三区| 超h公用妓女精便器系列小说| 18禁黄网站免费| 伊伊人成亚洲综合人网香| 国产一起色一起爱| 欧美在线 | 亚洲| 亚洲另类激情专区小说图片| 国产精品久久久久影院嫩草| 日日摸日日踫夜夜爽无码| 自慰被室友看见强行嗯啊男男 | 亚洲另类激情综合偷自拍图| 一本大道av伊人久久综合| 欧美性猛交xxxx免费看| 国产看黄网站又黄又爽又色| 亚洲精品蜜桃久久久久久|